Construction of Material Recovery Facility and Garbage Transfer Stations
CONSTRUCTION OF 3 RECOVERY CUM TRANSFER STATIONS
About the project
There are total 56 sectors that are covered inside Chandigarh boundary, inclusive of 13 villages: Manimajra, Mauli Jagran, Makhan Majra, Halo Majra, Dhanas, Maloya etc. The proposal of garbage transfer station before dumping the end waste into existing JAYPEE Plant, adjoining Daddu Majra Dumping Ground Site Includes the proposal of three transfer stations cum material recovery facilities strategically located to cover the whole city of Chandigarh. These three stations are proposed as:
Project Components
- MRF-cum GTS-I @ Proposed Animal Carcass Site, west of Sector 25
- MRF-cum GTS-II @ Public Health Store, Industrial Area, Phase 1
- MRF-cum GTS-III @ 3BRD STP area, Industrial Area Phase 2
Brief scope of work
- Universal accessibility for all age groups.
- Creation of a holistic and inclusive environment.
- Sensory engagement, mobility and motor skills.
Brief scope of work
- Construction of Material Recovery Facility cum Transfer Stations
- Conveyor Belt 2nos.
- Industrial shed as per specification & drawings.
- Weigh Bridge (10 MT capacity) 3Nos.
- Automatic Boom Barrier 2 Nos.
- Automatic Truck Tyre Wash System 1 Nos. (at MRF cum GTS –Zone I and Manual system at MRF cum GTS – Zone II & MRF cum GTS – Zone III)
- Parking as per specifications & drawings
- CCTV with SCADA System as per specifications
- Mechanical, Electrical & Plumbing Works as per specification
- Pre-cast compound wall as per specifications & drawings
- Date of completion:31.12.2021
Other Details
No of MRF Stations: 3
Project Cost: 13,38,49,347INR
- STATUS: Work Completed